School Renovations

Renovations were completed in 2005.
One of the most visible renovations was the raising of a new front entrance for the school. The new entrance provides a front foyer and new office facilities. The front steps to the building, covered over 20 years ago, are uncovered and refurbished. These two parts of the project are visible to all.
The new office space is back in Wing One. Likewise, the Guidance and Co-op offices are back in Wing One. All classrooms are now up and running back in their original locations.
|
|
The renovations covered four main areas. They are the Exterior Surfaces, the Interior Surfaces, Electrical work, and Mechanical work.
EXTERIOR SURFACES
- Chemically cleaning the masonary surfaces on the older portions of the multi-addition.
- Painting of previously painted stucco surfaces, railings, louvres, grills, aluminum windows frames and the like.
- Repointing of deteriorated mortar, usually below windows
- Creation of a bus pull-off lane in front of the school to improve safety of students.
INTERIOR UPGRADES
- Replace 60% of doors and hardware.
- Corridors - replace or make good the flooring, refinish walls, replace 10% of lockers and refinish the remainder, replace ceilings after renovations.
- Replace combustible ceiling tile with acoustic panels.
- Add kitchen storage room
- New sprung gymnasium floor
BUILDING - MECHANICAL SYSTEMS
- HVAC systems (Boilers and Air Conditioning)
- Air conditioning of administrative areas, library, and computer labs.
- Replace existing galvanized potable water piping with copper piping.
BUILDING - ELECTRICAL SYSTEMS
- New service and distribution.
- New fire alarm system.
- New emergency lighting and exit signage.
- New syncronized time keeping system.
|